.jpg)
September 24, 2024
6-Bedroom HMO
Project Type:
HMO
Reporting Style:
Initial & Interim Reports
GDV:
£440,000
Location:
Peterborough
The development consisted of a change of use from a dwellinghouse (Class C3) to HMO (Class C4) with the construction of a Dormer window. The property was a 3-bedroom terrace house and is being converted into a 6-bedroom HMO. All units will feature an en-suite shower room and kitchenette.
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
